§ 60.2600. How do I comply with the increment of progress for submittal of a control plan?
115 words·~1 min read·
/us/cfr/t40/s§ 60.2600·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs
(a)and
(b)of this section:
(a)Submit the final control plan that includes the five items described in paragraphs (a)(1) through
(5)of this section:
(1)A description of the devices for air pollution control and process changes that you will use to comply with the emission limitations and other requirements of this subpart;
(2)The type(s) of waste to be burned;
(3)The maximum design waste burning capacity;
(4)The anticipated maximum charge rate; and
(5)If applicable, the petition for site-specific operating limits under § 60.2680.
(b)Maintain an onsite copy of the final control plan.